South Putnam High School – Tank Installation

Scope: Fire Suppression Storage Tank Installation
Narrative: In 2025 we were requested to set a 50’+ long, 40,000 gallon fire suppression storage tank at South Putnam High School in Greencastle. Conexco provided a lifting plan, installed a 60’x16’ slide rail shoring system to minimize disturbance of the school grounds, and placed and backfilled the tank with our Cat 349 excavator with quite the peanut gallery! Conexco was on-site completing earthwork and utility installation for the fieldhouse addition and installed the tank in collaboration with our trade partners. We are grateful for their trust in Conexco!
Location: 1780 East U.S. Hwy 40, Greencastle, IN
46135




